Upper temporary gate

Projekt

The customer:

Water management company

 

The realization date:

2017

 

Project:

The temporary gate is used to fence the upper head of the water chamber from the water. It is used to create a dry dock during renovation work. The fencing is in a vertical position when fenced. After blocking, the barrier is rotated to a horizontal position (with the guide plate upwards) and remains floating on the water surface. The cover is also stored in this position.

Fotogaléria projektu

Other projects

Cylinder Relining – Dresser Rand

Projects

Upper temporary gate

Projects

GO Caterpillar Motor 3508

Projects

Waterdam Gate

hydro-eco Projects