Anchor points

Project

Customer:

Water management company

Project date:

2015

Project detail:

The original solution of anchor points was unsatisfactory due to time and technical requirements. The new mooring structures were designed so that hydraulic devices could be permanently mounted on them and did not interfere with the navigational part of the lock during navigation. Anchoring structures with hydraulic cylinders ensure the possibility of handling the upper temporary barrier with a weight of 250 tons and the lower temporary barrier with a weight of 400 tons.